PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing steel angles at Elev. 5,6 (4th Floor) for the metal decking Facing North-East (800x600).jpg Intalling foam insulation and backfilling along column lines K-M Facing East (800x600).jpg Started cutting the beam pockets at Stair -4 (Roof) Facing North (800x600).jpg Started excavating for the water tie in connecting the Courthouse at Rahway Ave (800x600).jpg Derrick -7 (2nd Floor) Facing North-West  (800x600).jpg Excavation for the water tie in at Rahway Ave.  (800x600).jpg
Previous pageNext page Derrick -7 (2nd Floor) Facing North-West  (800x600)
Derrick -7 (2nd Floor) Facing North-West (800x600)